Why AMC contracts lapse, and how to stop it

Nobody decides to lose an AMC. It expires on a Tuesday, nobody looks at the list that week, and four months later the customer has signed with whoever called them first.

By Edynex Technologies ยท ยท 6 min read

Why AMC is worth protecting

For most dealers, AMC is the only revenue that arrives without being sold again every month. It also holds the customer: the contract puts your engineer in their building four times a year, which is four chances to catch the failing compressor before a competitor does.

That makes a lapsed contract expensive twice โ€” the contract value, and the relationship that quietly moves to somebody else.

The four places contracts leak

  • โ–ธNobody owns the list. Renewals belong to whoever remembers. In a busy season, nobody remembers.
  • โ–ธThe reminder comes too late. A call on the expiry date is a negotiation from behind. Six weeks earlier, it is a routine renewal.
  • โ–ธThe schedule was never made. A contract with four visits a year and no dates becomes two visits, then an unhappy customer who will not renew.
  • โ–ธNobody can prove the visits happened. At renewal the customer asks what they got for the money. If the answer is a memory rather than a record, the price conversation goes badly.

Build the schedule at signing, not later

The single highest-value habit: the moment a contract is signed, the visits for its whole term exist as scheduled work. Not a note to create them, not a reminder โ€” the actual visits, dated.

This changes two things. Your service planning stops being reactive, because next month's preventive visits are already in the list. And at renewal you can show exactly which visits were done, when, by whom, and what was replaced.

Work a renewal window, not a date

A renewal is not an event on the expiry date; it is a window around it.

Roughly six weeks before expiry, the contract should appear on a working list โ€” early enough to schedule the conversation with the last preventive visit of the term, which is the best moment to ask, because your engineer is standing in their plant room having just done the work.

Keep a grace period after expiry too. Customers go quiet for a month for ordinary reasons, and a contract that vanished from the list the day it expired is one nobody calls back about.

In Nexus HVAC these are the defaults: contracts appear 45 days before expiry and stay visible for 30 days after. The exact numbers matter less than having both a lead time and a grace window at all.

What the renewal conversation needs

Three facts, ready before you dial. None of them should take an afternoon to assemble.

  • โ–ธVisits done this term, with dates โ€” the answer to "what did we get for it".
  • โ–ธWhat was replaced or repaired, and what it cost them outside the contract, if anything.
  • โ–ธThe machines covered, by serial number, so the renewal is priced on what they actually run today rather than what they had three years ago.

Comprehensive or non-comprehensive: decide it in the record

Whatever your terms, the system must hold which one applies to each contract, because it decides whether a spare on a visit is billable. Dealers lose real money here: a part fitted under a non-comprehensive contract, issued off the van, never billed, because the engineer assumed it was covered.

The fix is not a policy document. It is that the cover is recorded against the contract, and the person logging the job sees it at the moment they log it.

Nexus HVAC builds the schedule when the contract is signed

Visit schedule created at signing, and a renewal list that shows contracts 45 days before expiry with a 30-day grace after โ€” so a lapse is a decision, not an accident.

Questions schools ask

How far ahead should we start chasing a renewal?

Around six weeks gives you room for one conversation, one reminder and one site visit before expiry, without the customer feeling chased. Pair it with the last preventive visit of the term if you can.

Should expired contracts stay on the list?

For a while, yes. A month of grace catches the customers who simply went quiet. After that it is a lost-contract conversation, which is a different one.

Do we need a separate system for AMC, or can it live with service?

It should be the same system. The value comes from the link โ€” the contract schedules the visits, the visits log against the machines, and the renewal conversation uses both.

Book a Free Demo

Want this set up for your school?

We will show you NEXUS ERP on your school's own structure, tell you plainly what is live today and what is still being built, and help you get the boring parts right โ€” the data, the numbers, the registrations.

Request a Free Demo

We respond within 2 hours โ€” no pressure, no obligations.

We call back within 2 hours. Your details are used only to contact you about NEXUS ERP.